I used a single picker with an adjustable lifting beam with chains on each lifting points, raised rear higher and when frame cleared engine mounting, turned frame a quarter turn and roll away from engine. I remove front tire and fender before starting.Well said basically screw it. Regrouped. Now picking up a 1800 capacity stand and wheel chock for front tire plus a 1000 lbs hydraulic table cart. New game plan. Place expensive chock in place and jack bike up with single cherry picker. Then transfer engine to expensive table cart Via expensive second cherry picker from expensive floor jack. Freaking ridiculous. Did buy two Hydraulic jack oils at 15 FL OZ to bleed and fill all the above. It appears the chinese do not like to bleed or fill there Hydraulic equipment Either way the stuff is expensive and should hold up for a bit. Will post pics of operation while in progress.![]()
![]()
![]()
![]()
![]()
![]()
Last edited: